The “V2B1” is the flagship of environment 21.  Its unique standard pre-cast concrete two manhole design allows it to help you meet the EPA goal of 80% TSS removal efficiency. The inlet manhole has a tangential mounted inlet pipe that creates a swirl flow pattern, which improves flow distribution and reduces turbulence, thus enhancing sedimentation settling.  Proper sizing essentially offers a complete removal of sandy sediment. The environment 21 "Center Withdrawal Elbow Pipe" conveys flow to the outlet manhole where floatable debris is retained by using an underflow baffle. And, as with all environment 21 products, maintenance is a cinch with access openings to all stages and a clear view to the sump. The V2B1 is ideal for unique site scenarios with other utilities.


If you are looking for a cost effective option to help meet EPA Phase 2 Stormwater requirements then contact our sales office at 1-800-809-2801
.

PDF
» MASTEP TechSummary
»  NJCAT Verification
» Wayzata nf
»
Fridley Case Study
» Gov. Engineering '04
» Van Cortlandt Park
»
Ontario Ministry of    Environment Approval

V2B1
 
   
 
   
   
       
STORMPRO ESK KOALA PURISTORM ENVIROTRAP UNISTORM UNISCREEN V2B1
<< Website & 3D Development: www.runawaydimensions.com >>                                  <<All Rights Reserved | ENV21| 1-800-809-2801 | email: envengr@env21.com >>